loader

Infinite Resort Townhouses - Communal Pool

Ref: ES92

  • slide1

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide2

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide3

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide4

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide5

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide6

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

  • slide7

    Infinite Resort Townhouses - Communal Pool

    Esentepe2 bedroom(s)2 bathroom(s)105m²

    FROM £169,900

    FOR SALE

Property Description

Luxury Apartments * Direct Sea Views * 200 Meters from Golf Course * Infinity Swimming Pool From Terrace * Resort with Tennis Courts * Gym * Restaurant * Playground * Sauna

Located on an already successful Esentepe resort with many satisfied residents, you will find these stunning luxury apartments (1,2,3 bedrooms) being built over the course of 12 months. The Resort is located on the mountainside, minutes from the Korineum Golf Course Club, SPA and Beach. At your fngertips you will have Mediterreanean beaches, a Water Slide Park, Restaurants, Golf, Tennis, and amazing archeological sites to visit. 

Special Features:

Infinity Swimming Pool just off Terrace (except Block D)

Silver Goods Included 

Sliding Fitted Wardrobes Throughout

Stylish Light Grey 60x120 Tiles Interior

60x120 Non Slip Tiling in ourtdoor areas

Botanical Gardens in Communal Areas

Payment Schedule (flexibile):

1) 30% of the sale price is payable upon the signing of the Contract of Sale

2) 30% of the sale price is payable in 15 to 18 equal monthly installments up to the completion of construction

3) 40% of the sale price is payable over 12 equal monthly installments from the date of completion of construction 

*Off-plan cash buyers who pay the full purchase price upon the signing of the Contract of Sale will receive a 10% discount.  
*After full completion cash buyers who pay the full purchase price upon the signing of the Contract of Sale will receive a 5% discount.   

Luxury 2 Bedroom Ground Floor Apts from 144, 900 GBP

Luxury Penthouses 2 Bedroom with Rooftops Available from 154, 900 GBP

3+1 Luxury Corner Apartment From 164, 900 GBP

Specification

Structure:  All of the building structures will be of Seismic Reinforced Concrete as stated in the project plans and drawings.   

Walls:  Perforated clay building bricks will be used for all the internal and external walls of the buildings as stated in the project plans and drawings. Brick sizes will be 25cm × 10cm × 30cm.  

Wall Finishings: External Walls:  3 layers of cement based plaster will appropriately be applied. Special care will be taken to obtain smooth finishing, proper corners and edges. Before the application of undercoat paint, all the walls will be rubbed down smoothly and any cracks will be cut down and filled. After the application of undercoat, a thin layer of paste will be applied and rubbed down again where necessary. 3 layers of acrylic based paint will be applied for finishing. There will be no visible brush or roller marks once the painting is finished.   
Internal Walls: 3 layers of cement based plaster will appropriately be applied and rubbed down to obtain a smooth surface. Special care will be taken to achieve proper corners and edges. Before the application of undercoat paint, all the walls will be rubbed down smoothly and any cracks will be cut down and filled. After the application of undercoat, a thin layer of paste will be applied and rubbed down again where necessary. 3 layers of plastic based paint will be applied for finishing. There will be no visible brush or roller marks once the painting finishes.  

Ceilings:  Cement based ready made plaster will be applied (Sivateks, Bimteks or equivalent) and surfaces will be rubbed down and cleaned to have them ready for painting. After the application of undercoat, a thin layer of paste will be applied and rubbed down again where necessary. 3 layers of plastic based paint will be applied for finishing. There will be no visible brush or roller marks once the painting is finished. For painting Marshall, Dyo or equivalent quality paints will be used.    


Wet Surfaces:  The bathroom and WC will have non-slip ceramic tiles on top of two layers of cement based plaster and one layer of insulated cement based liquid.  The ceramic wall tiles will be laid up to the suspended ceiling of the room. Ground ceramic will be non slip type. The ceramic tiles will be left in the water for at least 24 hours before use and then will be fixed with 3 milimeter space between them. The ceramic tiles’ value will be up to $15/SqM.   

Floor Coverings: All internal floor coverings will be of 60 X 120 cm light grey colour ceramic tiles. There will be 15cm high skirting boards fixed where necessary from the same materials. The ceramic tiles will be left in the water for at least 24 hours before use. (The ceramic tiles’ value will be up to $15/SqM).   
All the bathrooms, WCs and outdoor areas will  have 2 coats of cement based isolation, one on top of minimum 8 cm concrete layer an done layer underneath. The spacing between the fixed tiles will be 3mm.   


All outdoor terrace floors, roof terraces, balconies and the stair areas will be paved with 60 X 120 cm non slip ceramic tiles of a light grey colour. These areas will have 15cm high skirting boards fixed from the same material. For the roof terrace, one coat of waterproof insulating material will be used. After this a high densiy foam will be placed under a level concrete and a final layer of waterproof insulating material will be applied and covered by ceramic floor tiles.  
Doors and Windows:  The entrance door will be manufactured from MDF material and will be painted. Handles of the doors, stoppers, locks and the hinges will be of the quality of Hafele or equivalent.  
All internal doors will be American pressed type.  Internal door handles, stoppers, locks and the hinges will be of the quality of Hafele or equivalent.  
All the external doors and windows (except the entrance door) will be comfort glass for heat insulation, anthracite colour Sapa or Schüco or equivalent aluminium, complete with all fixtures and fittings including locks, handles, felts etc.   All colours for above materials will be determined by the construction company. All materials used will be tested and approved by the construction company including the cross section of the aluminium.  

Bedroom Wardrobes: Bedroom wardrobes will be made from laminated material with a sliding door system. Their height will be up to the ceiling and one panel will have a mirror affixed. There will be an adequate number of shelves, drawers and hanging rails. The colour of the wardrobes will be decided by the buyer.   

Kitchen: All the kitchen cupboards will be made from laminated material as stated in the original plans and drawings. There will be an adequate number of shelves and drawers plus a dust bin and plate shelf. The hinges will be internal. The kitchen sinks will be stainless steel with 1 + ½ bowl. Colours of the cupboards worktop and drawers’ handles will be chosen by the buyer. Silver goods will be included (dishwasher, washing machine, oven, hob, extractor fan, fridge/freezer.)  

Sanitary Wear: The sink basin and lavatory will be fixed appropriately according to the project plans and drawings. They will all be complete and in good working order.  All the lavatories will be a wall hanging type with a concealed cistern and tank . All showers will be a walk in type with a glass door, water mixer and showerhead etc. The sink basins will be fitted to a vanity unit plus a mirrored cupboard will be fitted to the wall above. All armatures will be of first class chrome plated type (Grohe or Hansgrohe or equivalent) and have one mixer tab. Each bathroom and WC will have a toilet paper holder, soap holder, one long and one short towel bar.   

Mechanical Works:   Each apartment will have an immersion water heating system and solar heating  unit which will be placed on to the roof  terrace. Internal hot and cold water piping will be plastic and the external hot and cold water piping will be of galvanized iron piping. All the waste water pipings will be plastic as stated in the project plans and drawings. Rain water drainage piping will also be plastic and will be fixed outside the buildings.  
The waste water treatment plant will be biological treatment type. All the buiding’s waste waters will be connected to it as stated in the mechanical project . The plant will be in good working order and the treatment of the waste water will be done in accordance with the relavant environmental rules and regulations.  
  
Electrical Works: All the electrical works will be applied according to the British Standards and as stated in the electrical project. All the materials used will be EMO ( Chamber of Electrical Engineers) approved.  Each apartment will have a shaver and and hairdryer socket outlet.   
In addition a communal standby generator for the emergency power requirements of the whole site will be installed. It will always be ready to provide emergency power supply automatically with a changeover mechanism whenever there is a power cut.    The infrastucture of the main electricity supply to the site and the transmission unit will provided by the contractor. All rooms except bathrooms will have AC units.  

Communal Swimming Pools: Each apartment block except Block D will have a communal infinity swimming pool in front of the ground floor terrace according to the architectural and mechanical projects. The sun bathing area floor covering will be a 60cm x 120cm non-slip ceramic tile.  


Ground Arrangements:   The road front part of the project area will have Local Authority approved pavements. There will be car parking areas as stated in the Project and each apartment will have one car park area. There will be adequate pedestrian pavements between the buidings with adequate lighting will be built. There will be appropriate fencing surrounding the project area with the exception of road front. The communal areas will feature a Botanical garden with an irrigation system.

Floor Plans

post img

post img

post img

Contact Us

agent
Sales Consultant


Phone Office
+90 533 841 4910
(MON-FRI 9-5, SAT 9-2)

Send Message